Execution Excellence, Innovative Solution, and Customer Centricity: A Winning Approach to Making an Impossible Mission Possible

Earlier this year, Sunpin Solar and Direct Energy celebrated the completion of the ColGreen North Shore (CNS) Project in California, a 96.7 MWdc installation. However, as this case study shows, the project started as an impossible mission.

 

Execution Excellence, Innovative Solution, and Customer Centricity: A Winning Approach to Making an Impossible Mission Possible

Earlier this year, Sunpin Solar and Direct Energy celebrated the completion of the ColGreen North Shore (CNS) Project in California, a 96.7 MWdc installation. However, as this case study shows, the project started as an impossible mission.

Earlier this year, Sunpin Solar and Direct Energy, along with local and state leaders, had a ribbon-cutting ceremony to celebrate the completion of the ColGreen North Shore (CNS) Project in California. The project is a 96.7 MWdc installation with the capacity to power as many as 22,300 homes annually. Though the project is currently operating successfully and
positively impacting communities and the environment, it was once considered an impossible mission due to many obstacles
and setbacks.

This case study follows the ambitious and creative measures taken by Sunpin Solar to craft a cost-effective solution that would turn an abandoned project into a functioning solar site ready to meet its commercial operation date and enter an agreement with a PPA offtaker. 

Download this case study to explore the factors that drove Sunpin’s success:

Download

NULL

© Diversified Communications. All rights reserved.